University of Idaho Study Reveals Lake Operations Cost Bonner County Nearly $44 Million a Year

A newly released economic impact study conducted by the University of Idaho finds that the current water management strategy at Albeni Falls Dam is costing Bonner County approximately $43.9 million in lost economic activity every year — eliminating 435 full-time jobs and costing local households $14.3 million annually in lost wages and salaries.

Under current operations, full summer pool is typically not achieved until mid-June and drawdown begins by mid-September — providing roughly 90–96 days of full recreational access. The Corps then draws the lake down 11.5 feet, rendering most marinas, boat launches, docks, and water-based infrastructure inaccessible for nearly eight months of the year.

The study finds that each additional week of full summer pool generates an estimated $3.3 million in additional spending in Bonner County.

KEY FINDINGS:

• $43.9 million in total lost economic activity per year
– 435 full-time jobs eliminated
– $14.3 million in lost wages and salaries annually
– $25.2 million in lost Gross Regional Product annually
– Tourism currently accounts for $410.6 million annually and 18% of regional employment

The proposed solution would stabilize the lake at full summer pool (2,062.5 feet) from May 1 through September 30, providing approximately 171 days of full recreational access — roughly 60 more days than the current plan.

A public survey drew over 1,500 responses, with 95% saying access to the lake is instrumental in their decision to live in the region and 48% ranking recreation as the most important purpose of Albeni Falls Dam.

The U.S. Army Corps of Engineers is currently accepting public comments on the Albeni Falls Dam Master Plan through February 27, 2026.