The Army Corps wants your comments on the Albeni Falls Master Plan
⏰ Public Comment Deadline: February 27, 2026
The U.S. Army Corps of Engineers has announced it is updating the Natural Resource Master Plan for Albeni Falls Dam — and they are accepting public comments through February 27, 2026.
Lake Pend Oreille is one of the largest and deepest natural lakes in the western United States — 68 miles long, over 1,200 feet deep, with 226 miles of shoreline. It also sits atop the Spokane Valley–Rathdrum Prairie Aquifer, the sole source of drinking water for more than 500,000 people.
Congress authorized Albeni Falls Dam for five equal purposes: power generation, flood control, navigation, recreation, and fish and wildlife conservation. But the dam generates just 42.6 megawatts — less than 1% of Grand Coulee’s capacity — while the Corps’ own data shows recreation visitor spending ($9.25 million) exceeds actual power revenue ($1.2 million).
BY THE CORPS’ OWN NUMBERS:
• Annual operating cost: $9.26 million
– Actual power revenue: $1.2 million
– Recreation visitor spending: $9.25 million
– Annual operating loss: $8.06 million
In 2001, the Corps compared actual operations against a higher-lake alternative. Over eight years, the higher-lake operation produced slightly more power, not less. There is no power vs. recreation tradeoff.
WHAT WE’RE ASKING FOR:
• Full pool May through October
– Winter pool at 2,056 feet instead of 2,051
– Transparent cost accounting
– Downstream projects pay what’s owed
– Treat all five purposes as co-equal — power is not king
TWO WAYS TO MAKE YOUR VOICE HEARD:
1. Submit your own comment to the Corps: Email albenifalls.masterplan@usace.army.mil — your comment doesn’t need to be long or technical. Just tell the Corps what the lake means to you.
2. Sign the Community Letter: Add your name here — takes 30 seconds.
For more information contact us here.





